News

Marine crane installation steps


1、The owner provides a fixed foundation below the deck and a mounting base.
 2、Cylinder and base connection is installed, the hydraulic system placed in the barrel, to avoid the sun and wind, to extend life expectancy.
3、From the top down view of the government, next to the driver's room.
4、The connection between the main boom and the housings needs a crane to complete it。
5、Driver's Office is so gorgeous installed.
6、Telescopic arm waiting to be installed up, the installation of a section of time-consuming test of skill.
7、Machine installation is completed, to complete such a finished product is by all teamwork.
8、Telescopic arm completely stretched out, the installation site suddenly caused everyone's attention.
9、The last link is the scene test hanging, the owner acceptance.
This project is abroad, I plant to send engineers to the scene to guide the installation. The local belongs to the tropical region, dispatched engineers to overcome the acclimatization of the physical discomfort brought to the end of the project installation and commissioning until the owner is satisfied with the receipt
INQUIRY NOW