Installation procedure of Marine crane.


1. The owner shall provide the fixed base below the deck and install the base.
2. The connection between the column tube and the base is completed, and the hydraulic system is placed in the tube to avoid wind and sun and prolong life.
3, The top view from the top down, next to the driver's room.
4、main arm and tube connection need with the help of a crane can be completed.
5. The driver's operation room is so beautiful.
6, the installation of the telescopic boom section section, spend a lot of time.
7, the whole crane installed, to complete such a finished product by team work.
8. The telescopic boom is fully extended, and the installation site immediately aroused people's attention.
9. The last part is site test crane,the owner check and accept.
This project is overseas, our  engineers to the site to guide the installation. The local area belongs to the tropical area, and the engineers overcome the physical discomfort caused by the soil and water, and the installation and debugging of the project will be completed until the owner is satisfied with the receipt and return to China.