-
GBM manufactures German technology, marine electro-hydraulic double-lobe bulk grab
-
Work with GBM to inspect the yacht crane production site
GBM yacht crane production process in strict accordance with national regulations lifti -
The monthly production of container spreader has reached 11 units
-
Our company Specially designed for offshore operations and custom-made grab series accessories
-
Diesel engine grab has become the first choice of all major shipowners, advanced technology, high efficiency and easy maintenance
-
Simple container spreader and I-type spreader exports to the United States
-
Zhanjiang port delivery to the PATRIOT owners repeatedly repeated purchase of our products praised a good
-
GBM to ensure product quality, manufactured products are done crawling test of not less than 1 hour
-
Radio remote control grab grasping grain testing, the customer at the scene very satisfied.
-
Solid waste grab in the factory delivery debugging
&nbs -
8 sets of wireless radio remote control grab delivery
-
15 consecutive days of delivery of GBM 16 remote grab
In the spring of March, the earth recovers. At this moment, the shipowner urgently need -
After 2 months of GBM engineer installation guide, export funnel has been assembled in the local terminal
GBM engineers overcame various problems such as acclimatization, high temperature and s -
Norwegian shippers order 4 wireless radio remote control grabs to be shipped to Shanghai
Recently, Shanghai Guanbo Lifting Equipment Co., Ltd dispatched 4wireless radio remote -
Hydraulic telescopic container spreader owners sign for debugging
GBM production of automatic hydraulic telescopic container spreader exports abroad, the -
Marine crane installation steps
1、The owner provides a fixed foundation below the deck and a mounting base. -
orange peel grab warehouse packing site
orange peel grab export packing, the company dispatched supervisors to guide the wareho -
Efficient productivity at the same time, but also acceptable to the most stringent test customers
The customer ordered 16 wireless radio remote control grab grabs, delivery time 15 day -
20 days to create a high-quality wireless radio remote control grab overnight
It takes only 20 days to place the order from the customer to delivery, once again to r -
Funnel overall delivery of another major test of GBM
The challenge is impossible -15 days to complete nearly 200 tons of funnel products -
GBM crane always maintain high quality production design
-
GBM Complete equipment suppliers
Bulk loading and unloading complete sets of equipment manufacturers: Figure grab - dust -
GBM production of 8 cubic garbage rubbings in Yangzhou TEDA environmental acceptance
Congratulations GBM 8 cubic garbage garbage grab in Yangzhou TEDA environmental accepta -
Delivery Indonesia customers four 4.3 cubic wireless radio remote control grab
GBM to undertake a small remote grab orders, fighting capacity is only 4.3 cubic meters